Over 30 years of industrial process experience
Istanbul, Türkiye
SearchRequest a quote
DESIGNED AND MANUFACTURED BY INFOMAK

Conveying powders and granules with a flexible screw conveyor

Move material from the feed point to your process through an enclosed conveying line designed for your plant layout.

From bag dumping to a mixer, from a big-bag station to a production machine: Infomak EHK moves bulk solids with a flexible spiral rotating inside a tube.

Few moving parts · Easy servicing · Accessible cleaning

Infomak EHK illustration: feed hopper, flexible tube and discharge-end drive
Infomak EHK illustration · Layout is illustrative; route and performance are assessed by material.
02

What is EHK and how does it work?

Flexible spiral operating inside an enclosed tube

EHK is a bulk solids conveying system known internationally as a flexible screw conveyor. Material reaching the feed hopper or inlet connection travels along the tube to the outlet, driven by a motor-powered flexible spiral.

Under suitable design conditions, the spiral conveyor line can follow a horizontal or inclined route. Inlet and outlet connections are arranged to suit the source and receiving equipment. Conveying is therefore treated as part of the process feeding requirement, not simply a pipe connection.

Infomak EHK tube and metal spiral detail
Actual part photo · Spiral and tube shown separately; the spiral sits inside the tube during operation.
03

Which plant problems can it help solve?

Move open transfer into an enclosed line

Open conveying and transfer points can disperse material and increase cleaning work. An enclosed conveyor helps limit material contact with the surroundings along the route; dust control at inlet and outlet is designed separately. An enclosed tube alone does not establish fully dust-free or hygienic suitability.

Conveying that considers material integrity

For fragile granules or pellets, reaching the destination is not enough; preserving product structure also matters. Spiral selection and operating conditions are assessed for the material, and gentle handling is verified by sample tests where needed.

Route between existing equipment

Plants do not always have a straight, clear conveying corridor. The flexible tube–spiral design allows curved routes within permitted bending conditions. Sharp turns or routing around every obstacle are not assumed suitable; the layout is checked for each project.

Simple mechanical design in the conveying line

The spiral is the main moving element that advances material through the tube. “One moving part” describes the conveying element; it does not mean the motor, gearbox or any auxiliary feeding equipment has no moving components.

Minimal maintenance, easy servicing

With few moving parts, EHK offers minimal maintenance needs and long service intervals. Material is conveyed by a shaftless spiral rotating inside a closed tube. Routine checks of the tube, connections and drive are carried out as part of a maintenance plan suited to operating conditions.

Make cleaning part of the design

On lines with material changes, the tube can be easily removed via a quick clamp and cleaned. Alternatively, safely stop the line and fit a suitable clean spare tube; the removed tube can be cleaned while the restarted line operates. This minimises cleaning downtime. Cleaning of the spiral and other product-contact surfaces must also be considered; changing only the tube does not clean the entire line. Wet cleaning, food contact and allergen compatibility are confirmed per project.

Match investment to process needs

In suitable applications, EHK can be an economical alternative to other conveying methods. Compare not just device prices but also installation, auxiliary equipment, energy, cleaning and maintenance requirements.

Actual photo of Infomak feed hopper and clamped pipe connections
Actual connection detail · Hopper, feed connection and removable pipe joints. Plan service/cleaning access with layout.
04

Which materials can be considered?

Material-specific selection for powders, granules and pellets

A powder conveying system and a granule conveying line may operate under different conditions. EHK suitability is determined by examining flow behaviour, particle structure, moisture, bulk density and abrasiveness together, not by material name alone.

Examples include flour and similar powdered raw materials, feed ingredients, pellets, plastic granules and raw material additives, cement, ash and mineral powders. This list does not mean every material can be conveyed under all conditions.

Preliminary assessment is particularly important for sticky, moist, bridging, abrasive or fragile materials. Specify food-contact, temperature and hazardous-area requirements in the quotation request; suitability is confirmed separately.

Your material is not listed? Share its properties so we can assess conveying suitability.

05

Applications and industries

IndustryPotential application scenario
CementTransfer additives or mineral powder from a feed hopper to a preparation or mixing point. Wear and dust control requirements are assessed together.
Animal feedConvey feed ingredients to the mixer feed point. For pellets, also check product integrity and sensitivity to breakage.
FoodTransfer flour or similar dry raw materials from a preparation hopper to production equipment. Food contact and cleaning between products guide the design.
PlasticsDeliver plastic granules or suitable additives to the machine feed hopper. Layout, feeding requirements and raw material changes are considered together.
EnergyConvey ash or suitable dry process additives from a collection/feed point to the next equipment. Suitability is not approved without verifying temperature and abrasiveness.
TreatmentTransfer dry chemicals from a storage or feed hopper to a preparation unit. Moisture absorption, lumping and material compatibility are assessed.
InsulationFeed suitable powder or granular additives to a mixing preparation point. Light, fibrous or bridging materials require additional suitability assessment.
06

Application scenarios

Choose a requirement similar to yours. These are general scenarios; the outcomes describe design objectives.

Scenario A — Enclosed transfer from bag to mixer

Problem: Manual transport of powdered raw material to the mixer requires repeated lifting and open transfers.

Infomak solution: An EHK line is assessed between the feed hopper at the bag emptying point and the mixer inlet. Height difference, material flow and dust control at connections are designed together.

Effect — hedeflenen: Reduce manual intermediate transport and deliver material to the mixer along a defined, enclosed route.

Scenario B — Horizontal feeding and vertical transfer in confined space

Problem: Space around the hopper is limited; material must be transferred to a machine at a higher level.

Infomak solution: A layout combining a short horizontal feed below the hopper with adjacent vertical transfer is assessed. The connection between feed and lifting sections is designed according to material behaviour and machine needs. This is not treated as a single spiral turning through a sharp elbow.

Effect — hedeflenen: Establish a granule conveying connection suited to available space and define the feasible route using site dimensions.

Scenario C — Dry additive feeding to a preparation unit

Problem: Dry additives must be transferred to the preparation unit; conveying and target quantity control are being treated as the same requirement.

Infomak solution: The roles of the EHK conveying line and dosing system are distinguished. If precise quantity control is required, weighing, measurement and control equipment needs are assessed separately.

Effect — hedeflenen: Transfer the additive to the preparation point and clearly define the system required for quantity control. EHK alone is not presented as a guarantee of precise dosing.

Scenario D — Big bag (FIBC) unloading

Problem: Raw material in a big bag must reach the mixer or production machine; intermediate handling and open transfers complicate feeding.

Infomak solution: The big bag unloading station outlet connects to the EHK inlet to form an enclosed feeding line to the mixer or machine. Material discharge behaviour, station connection, route and receiving equipment needs are assessed together. The scope of the unloading station and auxiliary equipment is defined during quotation.

Effect — hedeflenen: Transfer raw material from big bag unloading to the process along an enclosed route, reducing intermediate transport and open transfer points.

ILLUSTRATIVE APPLICATIONFrom a big bag to an enclosed feed line
Illustrative principle diagram. The unloading station, material flow, routing and connection to the receiving equipment are defined for each project.
Infomak under-hopper horizontal feed connection and vertical-transfer inlet mounting detail
Actual assembly detail · Horizontal-to-vertical connection. A subassembly showing the connection, not a completed system.
07

Technical specifications and configuration

We review material and plant layout together. Six information groups form the starting point for configuration.

Material

Flow behavior, bulk density, moisture, grain structure and abrasiveness.

Capacity

Target flow and continuous or intermittent operation.

Installation position

Horizontal distance, elevation, incline and existing equipment.

Tube and spiral

Diameter, geometry and product-contact materials.

Feed and discharge

Hopper selection, big-bag connection and receiving equipment conditions.

Operation and cleaning

Cleaning method, service access and control integration.

Technical information considered in a quotation

Target capacity and operating mode
Preselection of Ø63, Ø90 or Ø125 outer tube
Horizontal distance, vertical rise and total route
Incline, bends and position of steep sections
Materials of product-contact parts
Hopper, inlet and discharge connections
Drive and control requirements

Send material and layout details →
08

Why Infomak Mekatronik?

Our own manufacturing, designed for your application

Infomak Mekatronik designs its own EHK systems around your plant's material and layout conditions. Feed point, conveying route and process connections are assessed within the same project.

Over 30 years of industry experience

Our industrial measurement and process experience focuses not only on the conveying line, but also on the equipment feeding it and receiving material from it. The aim is to integrate EHK suitably into your production flow.

Local technical support and site implementation

Contact the Infomak team directly for technical assessment and site implementation needs. Layout review, installation and commissioning support are scoped during quotation.

09

Frequently asked questions

How is EHK cleaned?

The quick-clamp tube is easily removed for cleaning. To minimise downtime, fit a clean spare tube and restart the line while the removed tube is cleaned separately. Removal and installation require safe power isolation and prevention of restart. The spiral and other contact surfaces are also part of the cleaning plan. Wet cleaning, food contact and allergen compatibility are confirmed per project.

Can different materials be conveyed in the same conveyor?

Suitability is assessed separately for each material. The quick-clamp tube is easily removed and cleaned or replaced with a clean spare. After safe replacement and required checks, the removed tube can be cleaned while the line operates, helping minimise downtime. Residues, cross-contamination and allergen risks extend beyond the tube to the spiral, hopper and other contact surfaces. Wet cleaning, food contact and allergen compatibility are confirmed per project; a tube change alone does not guarantee allergen-free changeover.

Can it convey on an incline and around obstacles?

Inclined and suitably curved routes can be assessed. Feasible incline and bending conditions depend on material and configuration; not every turn or vertical conveying request is automatically suitable. Inlet/outlet heights and a layout drawing are required for selection.

How is capacity determined?

Target capacity is assessed together with bulk density, particle structure, flow behaviour, feed arrangement, diameter, distance and incline. The same conveyor may not deliver the same mass throughput for different materials. Selection is verified with sample tests where necessary.

How often is maintenance required?

With few moving parts, EHK offers minimal maintenance needs and long service intervals. Material is conveyed by a shaftless spiral rotating inside a closed tube. Routine checks of the tube, connections and drive are carried out as part of a maintenance plan suited to operating conditions.

Can EHK be used as a dosing system?

EHK can serve as the conveying or feeding section of a dosing system. If a specific quantity or accuracy is required, measurement, weighing and control requirements are defined separately. Conveying capacity alone does not mean dosing accuracy.

LET US DISCUSS YOUR APPLICATION

Send your material and layout details.

Share the material name, target capacity and inlet/outlet positions. You can attach plant photos or a simple drawing. If technical values are not yet known, a description of your needs is enough.

Explore factors affecting EHK capacity →