CORE and OBSERVER


HydraSafe monitors individual cell voltages in an electrolyzer stack, providing data for efficiency, stability and maintenance decisions. Voltage deviations help investigate membrane degradation, cell leakage, insufficient electrolyte feed or electrode-coating changes.
Configured by project for AEL, PEM, SOEC and other electrolysis technologies. CORE measuring modules, BASE connection units, GATE fiber converters and the OBSERVER controller work together.
Modular structure from measurement to analysis
| Component | Function |
| CORE | Measures voltages of 16 cells. Detects wire breaks and indicates status by LED. Economy and Safety options are available. |
| BASE | Connects cell cables and CORE modules. Rail or box options are assessed with prewiring and fuse integration. |
| GATE / HydraLink | Transfers data via CAT5e or fiber. The official product page specifies fiber distances up to 2 km. |
| OBSERVER | Collects, records and analyzes data; connects to a PLC or analysis software. Lite, Economy and Safety options are available. |
PLC integration and data analysis
The OBSERVER datasheet specifies a Modbus TCP server. OPC UA and Profinet/Profinet SAFE are listed as planned in the same sheet. Since brochure statements differ, confirm required protocol and software version at quotation stage.
Cell voltage trends and alarm thresholds can support performance analysis and maintenance planning. Analysis software scope and availability depend on project configuration.
SIL2 and ambient conditions
The current website presents a SIL2 option. The attached March 2025 CORE and OBSERVER datasheets describe Safety versions as “up to SIL2 from 2026”. For safety applications, verify current hardware certification, safety manual and system architecture together. Economy and Lite versions are not automatically SIL2-covered.
Ex approval is listed as planned. CORE's +100°C operating limit does not apply to OBSERVER. IP20 modules require a suitable enclosure and compliance with their own ambient conditions.
Let us size your application together
Provide electrolysis technology, cell count, cell and total stack voltage, ambient temperature, PLC/protocol needs and cable distance. We will determine components and layout according to redundancy and functional-safety requirements.
Technical documents
HydraSafe General Brochure · EN · 5 pagesDownload document ↓CORE Datasheet · EN · 2 pagesDownload document ↓OBSERVER Datasheet · EN · 2 pagesDownload document ↓When is it suitable?
For monitoring electrolyzer condition, performance and deviations at cell level.
Technical selection and configuration
| Capacity | 16–500 cells according to the brochure; 16 channels per CORE |
| CORE measurement range | −2…+5 V; negative measurement is outside functional safety scope |
| CORE accuracy | ±1.5 mV; at a channel voltage of max. ±2 V |
| Sampling / resolution | 100 ms / 0,2 mV/bit |
| CORE supply / consumption | 21,6–26,4 VDC / 550 mW when active |
| OBSERVER supply | 18–32 VDC; typical input current 250 mA |
| Operating temperature | CORE: −30…+100°C; OBSERVER: 0…+60°C |
| Protection rating | CORE and OBSERVER: IP20 |
| CORE isolation | No channel-to-channel isolation; supply-to-channel and HydraLink-to-channel: 1400 V |
Confirm numeric limits and connection options against the current manufacturer datasheet and exact order code.
Installation notes
Place CORE near cell connections and OBSERVER where its own temperature and enclosure requirements are met. Determine cabling, isolation, fiber distance and power budget according to the manufacturer's installation manual.
ATEX and certificates
SIL2 is assessed with the appropriate Safety version and current certificate. Attached datasheets mark Ex approval as planned.
