Learn in brief steps how to prepare material, capacity, route, feeding, cleaning and plant information for EHK selection.

Six information groups are needed to select a flexible screw conveyor: material, target capacity, route, inlet and discharge equipment, cleaning and plant conditions. Choose tube diameter and motor after these are known.

Quick response

  • A material name alone is insufficient for selection.
  • Measure horizontal distance and vertical rise separately.
  • State capacity with units and operating mode together.
  • Do not guess unknown values; mark them clearly.
PRESELECTION WITH 6 INPUTS

Tap a heading to see why the information is needed.

TECHNICAL PRESELECTION

Material

Determines flow behavior and trial needs.

1 / 6
Missing information is not guessed. Enter “I don't know” in the form and complete it during the technical assessment.
Short application form

Start with what you know

You may attach a drawing or photo and leave unknown technical fields blank.

Open the EHK form

What information is needed to select a flexible screw conveyor?

TopicInformation to provide
MaterialName, bulk density, particle size, moisture, temperature and flow behavior
TargetCapacity and unit; continuous, intermittent or batch operation
RouteHorizontal distance, vertical height, total route, bends and vertical section
ConnectionsFeed equipment, inlet, discharge point and receiving equipment
CleaningProduct count, change frequency, cross-contamination and contact material
PlantEnvironment, power and control needs; zone classification if applicable

Bulk density, particle properties and moisture affect conveying behaviour. Report any observed adhesion, bridging, breakage or hardening while standing. If the product is insufficiently known, consider testing a representative sample.

Capacity is more than a kg/h figure. Specify continuous or intermittent operation, the time available to transfer a batch and daily operating hours. EHK is transfer equipment; define separate measurement and control requirements if verified weighing or precise dosing is expected.

How should the route be described?

Give horizontal distance and vertical rise from inlet to outlet separately. Show bend directions, location of steep sections, maintenance space and inlet/outlet elevations on a simple sketch. A single figure such as “eight metres total” does not describe the route geometry.

EHK principle from an older Infomak brochure: product leaves the hopper and is conveyed to the outlet by the spiral inside the tube
Principle diagram from the Infomak EHK archive brochure. This is not a dimensioned installation drawing; determine the actual route from material, capacity and site conditions.

Bag-dump hoppers, big-bag stations, silos and machine outlets have different feed conditions. Also state whether the receiving mixer, hopper or production machine accepts material freely at the discharge.

Why ask about cleaning and plant conditions at the outset?

If there are several recipes, food contact or cross-contamination limits, the changeover method is a design input. Space for disassembly and cleaning must be planned from the start.

State power supply, start/stop logic, level signals and other process interlocks. Where combustible dust poses a risk, base the final decision on the equipment nameplate, certificate and plant explosion protection document.

Common selection mistakes

Providing only the product name

The same product can behave differently with moisture and grain structure.

Describing the route with one distance

Show horizontal, vertical and curved sections separately.

Specifying capacity without units

kg/h, batch quantity and operating time are different information.

Leaving cleaning until last

Product change and cross-contamination can affect design.

Applications that are straightforward or need extra attention

Speeds up assessment

  • Simple dimensioned sketch
  • Photos of inlet and discharge
  • Representative material details
  • Capacity and operating time

Needs additional checks

  • Material behaviour unknown
  • Bridging or adhesion
  • Route with many bends or steep rise
  • Frequent product changes

Frequently asked questions

Must I know every technical value for an EHK quotation?

No. Do not guess unknown values. Start with material, task and inlet/outlet points; complete missing details during technical assessment.

Is total conveying distance enough?

No. Show horizontal distance, vertical height, bends and vertical-section location separately. A simple dimensioned sketch or photo speeds assessment.

Can one EHK convey multiple products?

Possibly; assess each product's flow and cleaning separately. Specify changeover, cross-contamination and cleaning before quotation.

Why does the selection form ask about ATEX?

In combustible-dust plants, zone classification and equipment requirements are project inputs. Verify selection using nameplate, certificate scope and the plant explosion-protection document.

Start EHK preselection

Add the information you have and any plant images to the short form.

Go to the application form