Example application scenario

Connection and fill-level monitoring during tanker-to-silo filling

Combined assessment of filling permission, pressure monitoring and line shut-off for cement, lime and powdered raw material silos.

In multi-silo plants, correct connection and target-silo readiness are required before filling. This scenario jointly assesses connection control and silo-monitoring needs.

Questions the operator must answer

How many silos and filling connections exist? Which material may enter which silo? Where does the operator see filling authorization? Which equipment stops filling on level or pressure alarms?

Commissioning scope

Prepare a test plan for authorization, warning, shutdown and restart behavior. Define thresholds, timing and fault behavior according to the plant risk assessment and manufacturer instructions.

Example application scenario. This is an application scenario, not a completed customer project, measured performance claim or reference-plant statement.
IndustryCement and building materials
MaterialPneumatically conveyed powdered raw material
ProcessTanker → filling connection → silo

Problem and measurement challenge

Wrong-line connection, attempted filling of a full silo and pressure changes during filling.

Technology selection

Connection detection and hose/line identification are separate tasks. Define coded coupling, connection detection, level and pressure monitoring needs individually.

Installation and technical notes

Review existing coupling, filling pipe, silo drawing, control panel and signaling points during site assessment.