Example application scenario. This is not a completed customer project. Technical suitability is verified against process information.
| Industry | Construction Chemicals and Dry Mortar |
| Material | Sand, cement, mineral fillers and additive powders |
| Process | Raw material silos → dosing → mixing |
Problem and measurement challenge
Abrasive materials, deposits and uneven discharge can affect material flow before dosing.
Technology selection
Consider full/empty alarms and feed-line flow/no-flow monitoring. Treat sand moisture as a separate measurement point; a flow switch does not replace a weighing system.
Installation and technical notes
Determine configuration from sand particle size, additive properties, process temperature and feeding geometry.